The provision of health facilities in the UK has been handed to Local Health Trusts who partner with the private sector in building and operating facilities under PFI, LIFT and Procure 21 methods of procurement.
Ensuring the delivered facilities reflect the needs of the clinicians and other stakeholders is vital so
ActivePlan
has developed an intelligent database that can hold all relevant design standards and reusable model solutions.
These are very complex projects with many stakeholders (some of whom are inexperienced in design and construction) and the traditional methods of capturing needs, turning them into briefs and specifications and ensuring the delivered facilities satisfy those needs whilst achieving cost and time objectives are inadequate.
Document: Traditional VS ActivePlan
ActivePlan
has developed an information management platform that:
- Improves communication
- Improves accuracy
- Increases productivity
- Increases agility
This applies from the earliest stages of user consultation through detailed design, construction and operational management of the finished building
Document: ActivePlan Full Process
ActivePlan
relates:
- People
- Activities
- Functions
to the built environment. Providing a collaborative environment where doctors and nurses can explore model layouts in 3D as interactive Virtual Reality models to fully understand options and make minor changes themselves.
Document: ActivePlan Health Care and SketchUp
Currently, each party works in isolation from an IT perspective, publishing documents that others have to interpret and usually manually rekey into their own systems.
ActivePlan
- Integrates data from different software applications
- Reduces wasted time
- Reduces potential mistakes
- Produces fully loaded floor plans and elevations more quickly
- Produces accurate schedules and room data sheets automatically
Users are finally able to move around a full VR model (SketchUp) of the rooms, departments and whole floors before they finally sign off.
To minimize the level of change post-tender,
ActivePlan
makes it far easier for designers to load every room and space with the previously agreed layouts, make any last-minute adjustments to each space in consultation with users using the 3D VR tools mentioned above. Once agreed,
ActivePlan
generates the fully load CAD drawings automatically with the related room data sheets and elevations or C Sheets.
- Improved productivity makes a previously uneconomic process affordable
- Improved user understanding
- They can imagine how space will work in context with adjacent spaces
- They feel part of the design process so stronger commitment to solution
- Less chance of unnecessary variations post-tender
- Better budget and quality control
- Defined baseline at Financial close
- Automated comparisons with any future variations including audit trail
- Enhanced user engagement in briefing and buy-in
- Fewer user group meetings needed
- Affordability considered in real time
- Coordinated and version controlled information
- Collaborative and concurrent design
- The means to properly consider sustainability and whole life implications
- Coordinated and accurate production information
- Less need for post FC changes
- Reduces additional costs and disputes
The combination of
ActivePlan
technology and processes delivers a more accurate and usable asset list and O&M that can help reduce running costs and improve availability of facilities.
- Automatically populates PPM software
- Saves time and reduces mistakes/warranty breeches
- Relates assets to functional spaces and activities
- More appropriate whole life considerations
- Activity-based costing of facilities PBR
- Enhanced helpdesk
- Intelligent buildings and the ActivePlan Facilities Information Model
- Unique tags against every asset also by system/circuit
- Barcode or RF tags
Retailers use
ActivePlan
to maintain records of previous designs and layouts and their success or otherwise to inform future designs. This is an automatic feature of
ActivePlan
and Healthcare clients and designers can re-use the information captured during the design and construction process.
- Encourages re-use of successful solutions
- Reduces wasted design effort
- Reduces costs by partial standardization
- More relevant post-occupancy evaluation
- Provides an improved format for comparisons such as DQI
- Platform for continuous improvement
|